1. To separate the semi-variable costs into their fixed andvariable
components, one can use which of the following methods?
a. Labor variance method
b. Material variance method
c. Relevant range of activity method
d. High-low point method

2. A budget prepared using several differing levels of activity isa:
a. fixed budget.
b. Aexible budget.
c. manufacturing cost budget.
d. budget performance report.

3. Direct factory labor is usually considered to be a cost.
a. variable
b. fixed
c. semi-variable
d. mixed

4. The cost of utilities consumed in the factory is a good exampleof a
____cost.
a. variable
b. fixed
c. semi-variable
d. standard

5. The salary of the factory supervisor is a good example of a _cost
a. variable
b. fixed
c. semi-variable
d. standard

6. As the level of activity increases, the fixed cost per unit ofactivity:
a. increases.
b. decreases.
c. does not change.
d. may increase or decrease.

7. As the level of activity increases, the variable cost per unitof activity:
a. increases.
b. decreases.
c. does not change.
d. may increase or decrease.

8. As the level of activity increases, the total variable costs forthe period:

a. increase.
b.decrease.
c.do not change.

d. may increase or decrease.

9. As the level of activity increases, the total fixed costs forthe period:

a. increase.

b.decrease.

c. may increase or decrease.
d. do not change.

10. Costs that reflect what costs should be for the units ofproduct
manufactured during the period under normal efficient operating
conditions are known as——— costs.
3. variable
b. fixed
c. standard
d. semi-variable

11. In a factory, the fixed costs per unit are $45 when 400 unitsare produced.
If 450 units are produced, the fixed costs per unit would be:
a. $45.00.
b. $40.00.
c. $10.00.
d.$50.63.

12. In a factory, the total variable costs are $600 if 500 unitsare produced. If
400 units are produced, the total variable costs would be:
a. $480.

b.$600.
c.$120.
d. $333.

13. The standard quantity of materials for a product was 40 poundsper unit
at the standard price of $2.00 per pound. The actual price perpound of
materials was $1.50, and the actual quantity used was 44 pounds.An
analysis would indicate a:

a. $20.00 favorable price variance.
b. $22.00 favorable price variance.
c. $6.00 unfavorable quantity variance.
d. $18.00 favorable price variance.

14. The labor standard for a product was five hours at a wage rateof $8 per
hour. The firm produced 900 units of the item. Labor coststotaled
$35,250 and 4,700 hours of labor were used. An analysis of laborcosts
would indicate:

a. a $750 favorable labor rate varianc~.
b. a $1,600 unfavorable labor time variance.
c. both the labor rate variance and the labor time variance
listed above.
d. a $1,600 favorable labor rate variance.

15. The quantity variance for an item is the difference between itsactual
quantity and its standard quantity multiplied by the:

a. standard cost of the item.
b. actual cost of the item.
c.price variance.
d. budgeted amount for the item.

16. An unfavorable price variance for materials means that:

a. the actual cost of the materials was more than the budgeted
amount.

b.” more materials were used in’ production than anticipated.

c. more labor hours were required to work with the materials
than expected.
d.
the actual cost of the materials was more than the standard
cost.

17.The materials price variance for an item is the differencebetween its
actual price and its standard cost:
a. multiplied by the actual quantity used.
b. multiplied by the standard quantity allowed.
c. multiplied by the difference between the actual quantity and
the standard quantity.
d.divided by the actual quantity.

18. The flexible budget usually shows:
a. only fixed costs.
b. only variable costs.
c. fixed and variable costs together.
d. fixed and variable costs separately.

Use the following information to answer questions 19 and 20.

The standard costs for a unit of product are shown below.

Materials 2 pounds at $1.00 per pound $2.00
Labor 1 hour at $10.00 per hour 10.00
Overhead 60% of di.rect labor 6.00

During JUne, Job N-5 for 100 units was completed. The actual costsof the

job are shown below.

Materials 300 pounds at $1.45 per pound $435
Labor 200 hours at $9.50 per hour 1,900
Overhead Applied 60% of direct labor 1,140

19. Which of the following represents the material pricevariance?
a. $325 unfavorable
b. $235 unfavorable
c. $100 unfavorable
d. $135 unfavorable

20. Which of the following represents the material quantityvariance?
a. $325 unfavorable
b. $235 unfavorable
c. $100 unfavorable
d. $135 unfavorable

ScholarMatic: Explanation & Answer

Your ready answer from a verified tutor is just a click away for as little as $14.99


  

Click Order Now to get 100% Original Answer Customized to your instructions!

HOME TO CERTIFIED WRITERS

Why Place An Order With Us?

  • Certified Editors
  • 24/7 Customer Support
  • Profesional Research
  • Easy to Use System Interface
  • Student Friendly Pricing

Have a similar question?

PLAGIRAISM FREE PAPERS

All papers we provide are well-researched, properly formatted and cited.

TOP QUALITY

All papers we provide are well-researched, properly formatted and cited.

HIGHLY SECURED

All papers we provide are well-researched, properly formatted and cited.

ScholarMatic: Get Started

Assignment Writing Service

Feel safe and secure when placing an order on our portal!
Fruitful cooperation begins with solid guarantees, and we are professional enough to promise perfect results. Let’s get it started!