Question: MS Project Problem – Suppose we have a complete activity predecessor table (shown below). Using M…

by | Nov 30, 2023 | Posted Questions



MS Project Problem – Suppose we have a complete
activity predecessor table (shown below). Using MS Project, enter
the activities, their durations and predecessors (use default Fixed
Units).

Activity

Activity Description

Duration

Predecessors

A

Conduct competitive analysis

3

—

B

Review field sales reports

2

A

C

Conduct tech capabilities assessment

5

A

D

Develop focus group data

2

A, B, C

E

Conduct telephone surveys

3

D

F

Identify relevant specification improvements

3

E

G

Interface with marketing staff

1

F

H

Develop engineering specifications

5

G

I

Check and debug designs

4

H

J

Develop testing protocol

3

G

K

Identify critical performance levels

2

J

L

Assess and modify product components

6

I, K

M

Conduct capabilities assessment

12

L

N

Identify selection criteria

3

M

O

Develop RFQ (Request for Quote)

4

M

P

Develop production master schedule

5

N, O

Q

Collaborate with sales staff

1

P

R

Prepare product launch

3

Q

1.      Identify the total
Duration:   

A)     34 days

B)     55 days

C)     57 days

D)     62 days

2.      Identify the Critical
Path:  

A)     A – (C through I) – L – M – O – P – Q
– R

B)     A – (C through I) – L – M – O – Q

C)     A – (C through I) – L – M – P – Q

D)     A – (C through G) – L – M – O – P – Q
– R

3.      If Activity B, Review field
sales reports, takes 7 days to complete instead of the 2 days
estimated, what happens to the total Duration and
why?  

A)     Total Duration does not change
because slack not totally used up

B)     Total Duration does not change
because only used up slack that was available

C)     Total Duration increases by 2 days,
because used up 3 days of slack plus 2 additional days

D)     Total Duration increases by 2 days,
because of critical path change, slack not overused

4.      Assume Activities A through I
are now 100% complete. What is the total project percent
complete?  

A)     42%

B)     46%

C)     53%

D)     57%

ScholarMatic: Explanation & Answer

Your ready answer from a verified tutor is just a click away for as little as $14.99


  

Click Order Now to get 100% Original Answer Customized to your instructions!

HOME TO CERTIFIED WRITERS

Why Place An Order With Us?

  • Certified Editors
  • 24/7 Customer Support
  • Profesional Research
  • Easy to Use System Interface
  • Student Friendly Pricing

Have a similar question?

PLAGIRAISM FREE PAPERS

All papers we provide are well-researched, properly formatted and cited.

TOP QUALITY

All papers we provide are well-researched, properly formatted and cited.

HIGHLY SECURED

All papers we provide are well-researched, properly formatted and cited.

ScholarMatic: Get Started

Assignment Writing Service

Feel safe and secure when placing an order on our portal!
Fruitful cooperation begins with solid guarantees, and we are professional enough to promise perfect results. Let’s get it started!