Final Project

by | Nov 30, 2023 | questions

Final Project

The purpose of the Final Project is to apply the concepts and
techniques of the “Planning and Budgeting with risks” module to the development of the following:

  • Project scope statement
  • WBS
  • Project schedule
  • Staffing (resource) management plan
  • Cost estimates
  • Risk management plan
  • Communications plan
  • Quality plan

Each of these will form a separate section of the Final Project.

The case study on which the project is based is as follows:

Project Background: The Research and Development
unit of the Property Development Department of the Government (PDDG) is
working on a program called the Seismic Zone Residential Construction
Improvement Program. PDDG is working to assess the effectiveness of the
boxes of a particular dimension used in the foundation of buildings.

PDDG has furnished the following specifications for the each box:

  • The size must be 300 x 250 x 200 cm with a slot of 10 x 10 x 25 cm.
  • The tolerance on outer dimensions must be +/-2 cm.
  • The tolerance on dimensions of the slot must be 0 to -3 mm in width. In short, the slot cannot be more than 10 x 10 cm.
  • It should be made of cardboard or metal sheet.
  • It should be made of small cubes of dimensions 5 x 5 x 5 cm.
  • It should be smooth in appearance.

The boxes should be delivered and assembled at the client’s site.

Company Background: Your company, Flexible Models
(FM), develops to-the-scale industrial models. Your principal clients
are industrial construction companies and your projects include building
manufacturing plants, refinery process plants, and public usage
buildings, such as halls and shopping malls.

FM also has clients in the residential construction business but
deals in building complexes having more than 17,000 square meters of
actual usable area. The model development skills of FM are well-known
across industries.

The key departments in FM are as follows:

  • Designing and Drafting Department: This department
    is involved in understanding the client’s design requirements.
    Generally, the client specifies the design of the product. The
    department prepares the detailed drawings for the Cutting Department. It
    also gives them the assembly drawings with guidelines on the assembly
    approach. The resources from this department are allocated exclusively
    to the project depending upon the project requirements. Roy Benjamin,
    general manager, heads the department. He needs alternate day updates on
    product design. He is also a man of detail and requires detailed
    analysis.
  • Cutting Department: This department’s staff is
    competent in cutting the parts and producing the units as per the
    drawings. The resources from this department are not allocated
    exclusively to the project. However, the project work is taken up by the
    department and then delivered back to the project. Michael Gartner,
    general manager, heads the department.
  • Assembly Department:This department is
    responsible for assembling the parts based on the design drawings. The
    resources from this department are allocated to the project exclusively
    depending upon the project requirements. Philip Cloony, general manager,
    heads the department.
  • Supply Chain Management (SCM) Department: This
    department is responsible for vendor management, market analysis,
    contracting, and procuring required resources. The department is a
    single point of contact for the supply chain. Jim Stanford, general
    manager, heads the department.
  • New Model Development: John Morris is the vice
    president of this division. John is adept at using the Web-based project
    tracking system and insists on maximising its use. He is a person of
    detail and prefers point-by-point communication. He is keen on regularly
    obtaining information on the progress of the project and the project
    management processes that are being implemented. Having realised the
    need for effective portfolio management, FM has initiated the
    organisation restructuring efforts under John’s leadership, who is also
    the project sponsor. He wants you to undertake this project and help in
    strengthening the organisation’s initiative. You have been authorised by
    John to select people from various key departments for your project.
    These people shall directly report to you for the duration of the
    project.

The marketing chief, Caroline Smith, wants to keep the budget under
control. Caroline is quite comfortable with quick information and does
not like details. She prefers one-on-one meetings or telephone calls for
quick updates.

FM primarily uses e-mail as the means of communication. The company
also uses a Web-based project tracking system to gather information.

The editorial team of a local journal, Construction Consortium Journal,
is interested in your project. Joseph Bukhmann, the chief editor, has
full faith in FM’s expertise. He wants to know more about the project to
report it in the journal.

Client Background:
Paul Lee, the technical lead at the Research and Development unit of
PDDG wants a once-a-week update about the progress of the technical
design. The Seismic Zone Residential Construction Improvement Program
Manager at PDDG would like to speak with you about the project progress
on a biweekly basis. However, he needs a short presentation on the
project status update two days before the biweekly call.

Assignment:
You are accountable for the project costs, and hence, you are keen on
developing realistic cost estimates and a realistic project budget. You
have already estimated the effort, which is given in the table below:

Task Name

Duration

Resource

Effort

Boxes

Requirements Analysis

Interview client stakeholders

4 days

Design

8 person days

Product detail analysis

6 days

Design

10 person days

Assembly

6 person days

Refinement of the final draft

2 days

Design

4 person days

Design and Concept

High level design

4 days

Design

4 person days

Details with operation designs

6 days

Design

12 person days

Production

Set up

4 days

Assembly

6 person days

Cutting and parts development

3 days

Cutting

9 person days

Sub-assembly 1

6 days

Assembly

12 person days

Sub-assembly 2

6 days

Assembly

12 person days

Sub-assembly 3

4 days

Assembly

8 person days

Assembly integration

3 days

Assembly

6 person days

Material

Cardboard sheet

50 sheets

Metal sheets

50 sheets

Cubes

900 pieces

Delivery

Pre-delivery

2 days

Will cost USD 3000

Shipment/Delivery—delivery takes 2 weeks by sea.

Outsourced

Will cost USD 6000

Implementation

7 days

Design

11 person days

Assembly

7 person days

‘Product detail analysis’ can start with ‘Interview client
stakeholders’. However, the final draft can be refined only after both
tasks are completed. The task ‘Details with operation designs’ starts
with a 50% overlap with ‘High level design’. The tasks ‘Sub-assembly 1’,
‘Sub-assembly 2’, and ‘Sub-assembly 3’ all start after the task ‘Set
up’ is completed. ‘Assembly integration’ starts only after all
sub-assemblies are completed. Pre-delivery can start after set up, while
shipment starts only after assembly integration. The last activity is
implementation.

The ‘Cutting and parts development’ task requires skilled labour and
is the most crucial task from a quality perspective. A minor mistake can
cause a lot of waste and escalation in the cost of the product. There
are only two skilled people in the company who can undertake this task
and they are always extremely busy. The probability that they will not
be available for this work in the schedule mentioned above is 0.7. This
has impact on the schedule as the schedule gets pushed by 6 days for
every day of delay in this task.

Traditionally, there has been a 0.3 probability of components getting
damaged during shipment and the costs should incorporate 30% of
additional budgeting for these incidences. In addition, factors such as a
change in client requirements after the cutting stage, a delay in the
arrival of raw materials needed for each task or process, and the time
wasted during incorrect set-up should be considered when you draw the
risk log and the risk management plan for the project.

Resource rates are as follows:

Material rate:

  • USD 20 per industrial cardboard sheet of 300 cm x 200 cm x (4 mm thickness) dimensions
  • USD 25 per metal sheet of 250 cm x 200 cm x (4 mm thickness) dimensions
  • Standard cubes of 4 cm are available in the market at USD 10 each

Labour rate:

  • Design department: USD 150 per day
  • Cutting department: USD 90 per day
  • Assembly department: USD 150 per day

For completing the project plan, additional information can be found at the following Web sites:

  • Liberatore, M. J. (n.d.) Using MS Project [Online] Villanova, PA: Villanova University. Available from: http://www.google.nl/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&ved=0CFAQFjAA&url=http%3A%2F%2Fwww70.homepage.villanova.edu%2Fmatthew.liberatore%2FVSB3008%2FMS_PROJECT.ppt&ei=4JfpT86JIon69QSx-pTHDQ&usg=AFQjCNHfx5MCosLmED0jvDyMajOCwdttBg
    (Accessed: 15 September 2009)

Note: A login box for Villanova University may
appear when you click this link. Click ‘Cancel’ in the box to launch the
PowerPoint® presentation.
Example of project plan in Microsoft® Project:

  • Plutonic Power Corporation East Toba River and Montrose Creek
    Hydroelectric Project proposed construction schedule [Online]. (n.d.).
    Available from: http://a100.gov.bc.ca/appsdata/epic/documents/p245/d21140/1137607116785_57cca76fbbb94930bfb5cd42fc4020fb.pdf (Accessed: 15 September 2009)

Using OpenProj™:
Getting started with OpenProj (2008) Available from: http://openproj.org/wiki/index.php/Getting_Started_with_OpenProj (Accessed: 15 September 2009)
Note: Additional documentation can be accessed by clicking Next Tip of the Day within OpenProj and by pressing F1, which will give you online help for the item underneath the cursor. Note also, as an open source software package, documentation and support will be limited.
Examples of a project plan in OpenProj

  • Example #1:

Gantt chart (2008) Available from: http://openproj.org/wiki/index.php/Gantt_Chart (Accessed: 15 September 2009)

Please make sure that you cite and reference all your outside sources properly, as per the Harvard Referencing System.

ScholarMatic: Explanation & Answer

Your ready answer from a verified tutor is just a click away for as little as $14.99


  

Click Order Now to get 100% Original Answer Customized to your instructions!

HOME TO CERTIFIED WRITERS

Why Place An Order With Us?

  • Certified Editors
  • 24/7 Customer Support
  • Profesional Research
  • Easy to Use System Interface
  • Student Friendly Pricing

Have a similar question?

PLAGIRAISM FREE PAPERS

All papers we provide are well-researched, properly formatted and cited.

TOP QUALITY

All papers we provide are well-researched, properly formatted and cited.

HIGHLY SECURED

All papers we provide are well-researched, properly formatted and cited.

ScholarMatic: Get Started

Assignment Writing Service

Feel safe and secure when placing an order on our portal!
Fruitful cooperation begins with solid guarantees, and we are professional enough to promise perfect results. Let’s get it started!