Name:
Section:
ACT 5704 – WEB and WEB 2
Cost Accounting
Summer Term, 2013
Quiz Two:
Chapters 7, 8, 10, 11; 14 – 16
100 Points
Instructions: Type your name above in the space
provided. Answer the following
multiple-choice questions by typing the best answer in the space provided
below. Do not submit the complete Quiz –
only submit this answer sheet. Each
question is worth 6 2/3 points. You may
use your textbook but you are not allowed to discuss the Quiz with anyone. Good luck!
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Use
the following to answer questions 1 and 2:
Spacer
Company has two service departments and two operating departments. Budgeted
costs and budgeted activity in the various departments for last year are shown
below:
|
|
|
Custodial |
|
Cutting |
Assembly |
|
|
|
Services |
Cafeteria |
Department |
Department |
|
Departmental costs……… |
$50,400 |
$28,000 |
$120,000 |
$200,000 |
|
|
Square feet occupied…… |
500 |
1,000 |
4,000 |
5,000 |
|
|
Number of employees…. |
10 |
15 |
75 |
100 |
|
|
Machine-hours……………. |
10,000 |
15,000 |
Service
department costs are allocated to operating departments with the costs of
Custodial Services allocated on the basis of square feet of space occupied and
the costs of the Cafeteria on the basis of number of employees. The
departmental costs for the cutting and assembly departments are overhead costs.
Predetermined overhead rates in the Cutting and Assembly departments are based
on machine-hours.
1. Assume that the company uses the direct
method of allocation. The predetermined overhead rate in the Assembly
Department would be closest to:
A) $16.27
B) $15.00
C) $15.87
D) $16.00
2. Assume that the company uses the step method
of allocation with Custodial Services allocated first. The amount of Custodial
Services cost allocated to the Assembly Department would be:
A) $0
B) $28,000
C) $24,000
D) $25,200
3. Product X-47 is one of the joint products in a joint manufacturing
process. Management is studying whether to sell X-47 at the split-off point or
to process X-47 further into Xylene. The following data have been gathered:
Selling price of X-47
I.
Variable cost of processing X-47 into Xylene.
II. The
avoidable fixed costs of processing X-47 into Xylene.
III.The
selling price of Xylene.
IV.The
joint cost of the process from which X-47 is produced.
Which of the above items are relevant in a decision of
whether to sell the X-47 as is or process it further into Xylene?
A) I, II, and IV.
B) I, II, III, and IV.
C) II, III, and V.
D) I, II, III, and V.
4. Robot Inc. has some material that originally cost $73,500. The
material has a scrap value of $45,600 as is, but if reworked at a cost of
$6,600, it could be sold for $58,100. What would be the incremental effect on
the company’s overall profit of reworking and selling the material rather than
selling it as is as scrap?
A) -$22,000
B) -$67,600
C) $5,900
D) $51,500
5.
Candle Corporation is preparing a bid for a special order that would
require 880 liters of material R9S. The company already has 280 liters of this
raw material in stock that originally cost $6.20 per liter. Material R9S is
used in the company’s main product and is replenished on a periodic basis. The
resale value of the existing stock of the material is $5.45 per liter. New
stocks of the material can be readily purchased for $6.20 per liter. What is
the relevant cost of the 880 liters of the raw material when deciding how much
to bid on the special order?
A) $5,456
B) $5,006
C) $4,796
D) $5,456
6. Oz Corporation is a
specialty component manufacturer with idle capacity. Management would like to
use its extra capacity to generate additional profits. A potential customer has
offered to buy 2,300 units of component OTB. Each unit of OTB requires 9 units
of material G58 and 7 units of material H66. Data concerning these two
materials follow:
|
|
Material |
Units in Stock |
Original Cost Per |
Current Market |
Disposal Value |
|
G58 |
18,940 |
$4.40 |
$4.65 |
$4.35 |
|
|
H66 |
15,700 |
$6.10 |
$6.50 |
$4.80 |
Material G58 is in use in many of the company’s products
and is routinely replenished. Material H66 is no longer used by the company in
any of its normal products and existing stocks would not be replenished once
they are used up.
What would be the relevant cost of the materials, in
total, for purposes of determining a minimum acceptable price for the order for
product OTB?
A) $189,890
B) $174,215
C) $168,533
D) $200,905
7. When the activity level
is expected to decline within the relevant range, what effects would be
anticipated with respect to each of the following?
|
|
Fixed |
Variable
|
|
A) |
Increase |
Increase |
|
B) |
Increase |
No |
|
C) |
No |
No |
|
D) |
No |
Increase |
8. Shipping costs at Columbia
Mining Company are a mixture of variable and fixed components.The company
shipped 8,000 tons of coal for $400,000 in shipping costs in February and
10,000 tons for $499,000 in March. Assuming that this activity is within the
relevant range, expected shipping costs for 11,000 tons would be:
A) $548,500
B) $544,500
C) $422,222
D) $554,000
9. To allocate corporate costs to
divisions, the allocation base used should:
A) be an output unit-level base
B) combine administrative costs and
human resource management costs
C) have the best cause-and-effect
relationship with the costs
D) allocate the full costs
10. The XTRA Appliance Manufacturing Corporation
manufactures two vacuum cleaners, the Standard and the Super. The following
information was gathered about the two products:
Standard Super
Budgeted sales in units 3,200 800
Budgeted selling price $600 $1,700
Budgeted contribution margin per unit $420 $1,100
Actual sales in units 3,500 1,500
Actual selling price $650 $1,680
What
is the total sales-quantity variance in terms of the budgeted contribution
margin?
A)
$220,000 favorable
B)
$340,000 favorable
C)
$556,000 favorable
D)
$896,000 favorable
Use
the following information for Questions 11 and 12.
Jet
Equipment uses a flexible budget for its indirect manufacturing costs. For
2013, the company anticipated that it would produce 18,000 units with 3,500
machine-hours and 7,200 employee days. The costs and cost drivers were to be as
follows:
Fixed Variable Cost driver
Product handling $30,000 $0.40 per unit
Inspection 8,000 8.00 per 100 unit batch
Utilities 400 4.00 per 100 unit batch
Maintenance 1,000 0.20 per
machine-hour
Supplies 5.00 per employee day
During
the year, the company processed 20,000 units, worked 7,500 employee days, and
had 4,000 machine-hours. The actual costs for 2013 were:
Actual
costs
Product handling $36,000
Inspection 9,000
Utilities 1,600
Maintenance 1,200
Supplies 37,500
11.
The static budget overhead variances total
A)
$2,800 U
B)
$2,800 F
C)
$160 F
D)
$160 U
12.
The flexible budget overhead variances total
A)
$2,800 U
B)
$2,800 F
C)
$160 F
D)
$160 U
Use the following information for
Questions 13 – 15.
Chloe Industries manufactures one product
and uses a standard costing system. The
following relates to the production of the product for the month of
October: Budgeted Fixed Overhead
$100,000; Budgeted Variable Overhead $150,000; Budgeted Production in Units
10,000; Actual Fixed Overhead $110,000; Actual Variable Overhead $185,000;
Actual Units Produced 11,000; Budgeted Direct Labor Hours 10,000; Actual Direct
Labor Hours 11,500; Standard Number of Direct Labor Hours per Unit of Output is
1. The activity to allocate overhead is
direct labor hours.
continued
13. The variable overhead spending
(budget) variance is
A) $20,000 F
B) $12,500 F
C) $20,000 U
D) $12,500 U
14.
The fixed overhead volume variance is
A) $15,000 F
B) $10,000 F
C) $15,000 U
D) $10,000 U
15. The variable overhead efficiency
variance is
A) $10,000 F
B) $10,000 U
C) $7,500 F
D) $7,500 U