Answered » You can buy a ready-made answer or pick a professional tutor to order an original one.
Post ACC211 Unit 2 Chapter 3 Assignment Latest 2017 August
Post ACC211
Unit 2 Chapter 3 Assignment
|
Greenwood
Company manufactures two products—14,000 units of Product Y and 6,000 units
of Product Z. The company uses a plantwide overhead rate based on direct
labor-hours. It is considering implementing an activity-based costing (ABC)
system that allocates all of its manufacturing overhead to four cost pools.
The following additional information is available for the company as a whole
and for Products Y and Z:
|
|
Activity
Cost Pool
|
Activity
Measure
|
Estimated
Overhead Cost
|
Expected
Activity
|
|
Machining
|
Machine-hours
|
$
|
203,000
|
10,000
|
MHs
|
|
Machine setups
|
Number of setups
|
$
|
121,900
|
230
|
setups
|
|
Production design
|
Number of products
|
$
|
87,000
|
2
|
products
|
|
General factory
|
Direct labor-hours
|
$
|
379,500
|
15,000
|
DLHs
|
|
|
Activity
Measure
|
Product
Y
|
Product
Z
|
|
Machining
|
7,300
|
2,700
|
|
Number of setups
|
50
|
180
|
|
Number of products
|
1
|
1
|
|
Direct labor-hours
|
9,500
|
5,500
|
|
|
1.
|
What is the company’s plantwide
overhead rate? (Round your answer to 2
decimal places.)
|
|
|
|
|
2.
|
Using the
plantwide overhead rate, how much manufacturing overhead cost is allocated to
Product Y and Product Z? (Round your
intermediate calculations to 2 decimal places and final answers to the
nearest dollar amount.)
|
|
|
|
|
3.
|
What is the
activity rate for the Machining activity cost pool? (Round
your answer to 2 decimal places.)
|
|
|
|
|
4.
|
What is the activity rate for the Machine Setups activity
cost pool? (Round your answer to 2
decimal places.)
|
|
|
|
|
5.
|
What is the activity rate for the Product Design activity
cost pool? (Round your answer to 2
decimal places.)
|
|
|
|
|
6.
|
What is the
activity rate for the General Factory activity cost pool? (Round your answer to 2 decimal places.)
|
|
|
|
|
7.
|
Which of the four activities is a
batch-level activity?
|
|
|
|
|
|
Machine setups activity
|
|
8.
|
Which of the four activities is a
product-level activity?
|
|
9.
|
Using the ABC
system, how much total manufacturing overhead cost would be assigned to
Product Y? (Round your intermediate
calculations to 2 decimal places and final answer to the nearest dollar
amount.)
|
|
|
|
|
10.
|
Using the ABC
system, how much total manufacturing overhead cost would be assigned to
Product Z? (Round your intermediate
calculations to 2 decimal places and final answer to the nearest dollar
amount.)
|
|
11.
|
Using the
plantwide overhead rate, what percentage of the total overhead cost is
allocated to Product Y and Product Z? (Round
your answers to 2 decimal places.)
|
|
|
|
|
12.
|
Using the ABC
system, what percentage of the Machining costs is assigned to Product Y and
Product Z? (Round your answers to 2 decimal
places.)
|
|
|
|
|
13.
|
Using the ABC
system, what percentage of Machine Setups cost is assigned to Product Y and
Product Z? (Round your answers to 2 decimal
places.)
|
|
|
|
|
14.
|
Using the ABC
system, what percentage of the Product Design cost is assigned to Product Y
and Product Z? (Round your answers to 2
decimal places.)
|
|
|
|
|
15.
|
Using the ABC
system, what percentage of the General Factory cost is assigned to Product Y
and Product Z? (Round your answers to 2
decimal places.)
|
|
|
|