The sales manager of Jeta Plastics Moulding (JPM), Frank
Morris, was concerned about
the bidding results of the last two years. JPM is a small
manufacturer of high pressure
injection-molded plastic parts, supplied to the automotive
industry. They are qualified
as a Tier 2 supplier and their customers are Tier 1
companies such as Lear, Magna,
Levine Controls and Faurecia. Tier 1 companies supply
directly to car assembly plants on
a just in time basis.
Over the past few years, JPM’s success in winning large
contracts had steadily declined,
forcing JPM to pursue greater numbers of small contracts and
moving up the supply
chain and becoming a Tier 3 supplier. This has become a
serious problem; the
company’s total business has dropped to such an extent that
it is currently operating at
only 70% of capacity.
Frank realized that there was something wrong with their
method of preparing bids. In
the past two years, Frank found that the rate of success in
winning bids increased as the
total size of the contract decreased; particularly he
observed that they were really
successful in the Tier 3 segment.
In their attempt to increase the total amount of sales for
JPM, they had submitted
almost double the number of bids compared to previous years,
but the number of bids
submitted for Tier 2 contracts remained the same although
the success rate declined
sharply. This resulted in two people from the accounting
department spending most of
their time preparing the cost data for the bids.
JPM used a standard full-cost accounting system, and bids
were prepared with the
objective of earning a 20% markup on total costs. Standard
hourly operating rates were
developed using regression analysis of monthly prior-period
costs for each machine and
process. These costs, labeled as conversion costs, included
all labour, job setup, and
mold development costs as well as fixed and variable
processing overhead costs. The job
setup and mold development costs were fairly constant from
job to job. The coefficients
from the regression analysis were used as the rates for
variable-cost items and the
intercept values were divided by full capacity processing
hours to determine the rates
for fixed-cost items.
Frank has the idea that there is something wrong with JPM’s
current bidding system.
Accordingly, he decided to test alternative approaches in
preparing their next bid for a
fairly small contract for instrument panel components requested
by Levine Controls Inc.
He started with the usual bidding method based on the cost
estimate prepared by the
accounting department (Exhibit 2-1), and made a mental note
that he would normally
have submitted a bid of $145,000. He then made his best estimates
of the probabilities
of winning the contract at various bids (Exhibit 2-2) based
on the past experience of the
last two years and the profile of the customer.
REQUIRED:
Using the case approach discussed in class, determine what
Frank Morris should do.
EXHIBIT 2-1
Cost Estimates for Contract to Supply 10,000 Automobile
Instrument Panel Components
to Levine Controls Inc
Standard Standard
Cost
Hours Rate/Hour per
Unit
Material $4.463
Conversion costs:
Labour: Variable 300 $21.97 $0.659
Fixed 300 25.17
$0.755
$1.414
Processing on machine: Variable 500 $51.50 $2.575
Fixed 500 35.50
$1.775
$4.350
Finishing: Variable 100 23.50 $0.235
Fixed 100 28.50
$0.285
$0.520
Total manufacturing costs before rejects $10.747
Rejects (1) 1.075
Total manufacturing costs $11.822
Selling and administration (2) 0.337
Total cost $12.159
Markup (20%) 2.432
Standard price per unit $14.591
Standard bid for 10,000 units (3) $145,910
Notes:
1) A 10% standard allowance was added for defective units
which would be rejected
during final inspection. This reflected a normal spoilage
rate.
2) Selling and administration costs were all treated as
fixed.
3) This contract would utilize 2% of JPM’s total capacity.
EXHIBIT 2-2
Probability Estimates Regarding the Potential Contract to
Supply 10,000 Automobile
Instrument Panel Components to Levine Controls Inc.
Probability of Bid Amount Winning Contract
$135,000 95%
145,000 85
150,000 80
155,000 75
160,000 65
As of today, Frank wants to carefully evaluate JPM’s method
of preparing bids and find
an explanation of how the rate of success in winning bids
was affected by this bidding
method. However, he also is facing an immediate challenge
that has to be solved:
considering only quantitative factors, what amount should
JPM bid for the instrument
panel component contract? What qualitative factors should be
considered before
deciding on the amount of the bid?
When thinking in the long term, there are other issues that
should be considered. A
couple of months ago top management has decided to replace
the existing production
system with a new, completely automated computerized
production system. This is
aimed at keeping up with technological advances in the
industry and hoping to improve
the company’s success in winning large contracts in the Tier
2 segment. This new system
will expand the total production capacity of JPM and
eliminate all labour except
maintenance and some handling. Fixed costs, however, will be
significantly increased.
What would be the implications in the bidding process of JPM
once the new
computerized production system is installed and what actions
need to be taken before
moving to the new system.
Proposed marking key:
Proper format and presentation: 5%
Introduction: 15%
Problem identification: pricing setting tied to full costs
10%
Analysis:
Current system: 15%
Determining the price of the bid: 20%
Assessing the changes in the future system: 10%
Alternatives: 10%
Recommendation: 5%
Regarding the recommended solution (2% each):
Solves the problem?
Uses the analysis?
Is derived from alternatives?
Is based on theory?
Makes business sense?
Case: Jeta Plastic Moulding (ADMS3510 Winter 2008)
Student:
Case Approach (5%)
format, spelling, grammar, sentence structure
Introduction (15%)
All relevant facts describing the company and its situation
Problem and Issue identification (10%)
. short term bid to Levine Controls (4%)
. long term issue related with bidding process (6%)
Analysis (45%)
Description of the limitations off the current system (15%)
a. The fixed processing rate is based on full capacity
b. 70% of capacity: under-allocation of fixed costs.
c. The costing of rejects is inappropriate: only variable
costs
d. “Standards” based on prior period costs are
inappropriate.
e. Learning curve: unit variable costs for large jobs <
for small jobs.
d. Inappropriate to use a single markup rate for all sizes
of jobs
e. Estimate competitors’ cost behaviour patterns and
capacity.
f. Using probabilities and contributions for preparing bids
Determine the price of the bid (20%)
a. price based on contribution margin (10%) or based on full
costs (5%)
b. Proper use of probabilities of outcome to determine the
expected value (10%)
Assess the changes in the future system (10%)
Alternatives (10%)
At least 2 mutually exclusive alternatives in terms of
bidding
process, calculation or price.
Recommendation (5%)
Clearly state what the company has to do immediately
Tests of the recommendation (2% each for a total 10%)
Solves the problem?
Uses the analysis?
Is derived from alternatives?
Is based on theory?
Makes business sense?
Subjective evaluation after comparing with other reports
Total