1.    Make-to-stock processes
a.    0 are best when demand is predictable andsteady
b.    0 result in longer lead times to fulfillorders
c.    1 are best when demand is seasonal
d.    0 result in lower inventory costs

2.    One way to decrease the process throughputtime would be
a.    0 to increase the process operation time
b.    0 to increase the process setup time
c.    1 to increase the process throughput rate
d.    0 to increase the work in process

3.    Productivity is usually measured in __________units and __________.
a.    1 monetary, labor
b.    0 labor, time
c.    0 monetary, time
d.    0 labor, rate

4.    When designing a process flow structuremanagers should consider
a.    0 required customer delivery times
b.    1 quantities required and the degree ofproduct customization
c.    0 potential supply chain disruptions
d.    0 prevailing local labor rates

5.    Capital equipment, such as robotic assemblylines used to replace hourly workers,
a.    0 improve production flexibility
b.    0 lower fixed costs
c.    1 increase the break-even point
d.    0 increase variable costs

6.    Learning curve theory is based on the premisethat
a.    0 the unit time required to produce a productwill decrease at an increasing rate
b.    0 the unit time to produce a product may beestimated by linear regression
c.    1 the unit time required to produce a productwill decrease at a decreasing rate
d.    0 the unit time required to produce a productwill decrease at a constant rate

7.    When evaluating a new product developmentproject using net present value analysis, which of the followingwill make the project more attractive?
a.    0 Delaying the start of the project
b.    0 Making the project run over a longer periodof time
c.    1 Improving (bringing forward) the date whenrevenue will begin
d.    0 Reducing sunk costs

8.    Value analysis/value engineering (VA/VE)
a.    0 relies on engineering inputs to minimize thecost of the product under development
b.    0 relies on research and development in orderto provide the latest technological improvements in the productunder development
c.    1 relies on customer provided inputs toprovide optimal performance at the lowest possible cost for theproduct under development
d.    0 relies on sales force input to design andbuild products at a cost making them easy to sell

9.    When marketing, engineering, and operationssimultaneously develop a process (cross-functional integration),this approach is known as
a.    0 sequential process
b.    0 traditional approach
c.    1 concurrent engineering
d.    0 core competency

10.    A corporate ISO 9001 certification
a.    1 applies only to service organizations
b.    0 mandates adoption of Six Sigmamethodology
c.    0 is required for TQM designation
d.    0 requires a periodic audit of the certifiedfirm

11.    A free product replacement under warranty isan example of
a.    1 an external failure cost
b.    0 an internal failure cost
c.    0 the cost of quality
d.    0 a sales and marketing cost

12.    An example of prevention costs as a type ofcost of quality is
a.    0 inspection
b.    0 testing
c.    1 train personnel
d.    0 rework

13.    Inventory carrying costs
a.    0 decrease as inventory on hand becomesobsolete
b.    1 increase when the cost of capitalincreases
c.    0 increase when there is a stockout
d.    0 decrease when shipping charges increase

14.    Fixed–time period ordering models(P-models)
a.    1 are most useful when demand ispredictable
b.    0 are most useful when demand unexpectedlyspikes
c.    0 are most useful when inventory carryingcosts are high
d.    0 are most useful when lead times are long

15.    The optimal order quantity Q-opt
a.    0 increases as holding costs increase
b.    1 increases as setup costs increase
c.    0 is independent of demand
d.    0 decreases as demand increases

16.    Materials requirement planning (MRP)
a.    1 is an infinite, backwards schedulingsystem
b.    0 is an infinite, forward schedulingsystem
c.    0 is a finite, backwards scheduling system
d.    0 is a finite, forward scheduling system

17.    Job sequencing priority rules
a.    0 impact the lead times
b.    0 impact the due date
c.    0 impact job processing times
d.    1 impact the total completion time

18.    According to Goldratt, a useful measure ofprofitabilty is
a.    1 cash flow
b.    0 gross margin on sales
c.    0 net profit divided by current assets
d.    0 earnings before interest and taxdeductions

19.    According to Goldratt and Fox, inventorydollar days are
a.    1 inventory costs multiplied by days indepartment
b.    0 work in process in department divided bycycle time
c.    0 cost of good sold multiplied by process setup time
d.    0 work in process in department multiplied bycycle time

20.    Matrix style organizations
a.    0 provide overall authority to the functionalmanager
b.    0 provide overall authority to the projectmanager
c.    0 do not allow participants to work on morethan one project at a time
d.    1 permit functional organizations to remainintact when projects are concluded

21.    One advantage of the network planning modelsover the Gantt chart is that
a.    0 they are easy to use and quite widelyunderstood
b.    1 they provide a procedure for determining aproject’s critical path
c.    0 they are less costly to use
d.    0 they relate activities to time in a usablefashion

22.    Outsourcing
a.    0 is always driven by the desire to reducecosts
b.    0 always results in mass lay-offs
c.    1 always turns fixed costs into variablecosts
d.    0 always allows an organization to improveprofit margins

23.    Capacity planning will always
a.    0 require the planners to consider the cost ofnew equipment
b.    0 involve trade-offs between outsourcing andbuilding a new factory
c.    0 require a physical inventory count
d.    1 require a sales forecast

24.    A kanban card is used to signal that
a.    0 work is ready to be moved to the nextstation
b.    0 a worker has run out of parts
c.    0 a machine has broken down
d.    1 work is authorized to replenish a downstreamstation

25.    In a just-in-time manufacturingenvironment,
a.    0 value stream mapping is used to setinventory levels
b.    0 safety stock is kept at constant levels
c.    0 everything is made to order
d.    1 nothing is manufactured until it isneeded

26.    Lean production was embodied in The ToyotaProduction System developed in Japan. Two philosophies of theJapanese culture are
a.    0 customer satisfaction and respect forpeople
b.    0 respect for people and increased employeeparticipation
c.    0 eliminate waste and increased employeeparticipation
d.    1 respect for people and eliminate waste

27.    In the functional areas of finance andaccounting, __________ provide the basis for budgetary planning andcost control.
a.    0 time series analysis
b.    0 casual relationships
c.    1 forecasts
d.    0 demand management

28.    The form of capacity planning that covers atime horizon for the next 6 to 18 months, with time increments thatare monthly or quarterly is
a.    0 short-range planning
b.    0 long-range planning
c.    1 intermediate-range planning
d.    0 sales and operation planning

29.    Strategic capacity planning dictates thatwhen product demand temporarily declines,
a.    0 production overhead needs to be permanentlyreduced
b.    0 finished goods inventory needs to bereduced
c.    1 any existing external capacity should bereduced
d.    0 capacity cushions must be maintained

30.    The centroid method calculates the optimallocation for a single facility based upon
a.    0 customer density function
b.    0 shipping costs between facilities
c.    0 overhead expenses
d.    1 the location of existing facilities andvolumes shipped

ScholarMatic: Explanation & Answer

Your ready answer from a verified tutor is just a click away for as little as $14.99


  

Click Order Now to get 100% Original Answer Customized to your instructions!

HOME TO CERTIFIED WRITERS

Why Place An Order With Us?

  • Certified Editors
  • 24/7 Customer Support
  • Profesional Research
  • Easy to Use System Interface
  • Student Friendly Pricing

Have a similar question?

PLAGIRAISM FREE PAPERS

All papers we provide are well-researched, properly formatted and cited.

TOP QUALITY

All papers we provide are well-researched, properly formatted and cited.

HIGHLY SECURED

All papers we provide are well-researched, properly formatted and cited.

ScholarMatic: Get Started

Assignment Writing Service

Feel safe and secure when placing an order on our portal!
Fruitful cooperation begins with solid guarantees, and we are professional enough to promise perfect results. Let’s get it started!