Acme Gears, Inc. is suffering from warranty field problems, including a recall on a certain part. From a cost-of-quality perspective, what arguments should engineering use to convince company management that a lean six-sigma program is needed at the company?
What are the risks of using as a decision limit to decide whether or not a measurement system is adequate? NOTE: is an estimate of the combined repeatability and reproducibility standard measurement error. USL and LSL are upper and lower spec. limits, respectively.
Acme Gears, Inc. is suffering from warranty field problems, including a recall on a certain part. From a cost-of-quality perspective, what arguments should engineering use to convince company management that a lean six-sigma program is needed at the company?
What are the risks of using as a decision limit to decide whether or not a measurement system is adequate? NOTE: is an estimate of the combined repeatability and reproducibility standard measurement error. USL and LSL are upper and lower spec. limits, respectively.
A gage R&R study is conducted on a product characteristic having LSL =10 and USL = 20 with the following results:
Equipment variation (EV) = 0.50
Appraiser variation (AV) = 0.90
Part variation (PV) = 2.8
Is the gage capable?
Engineers have designed a new engine controller which not only controls air-fuel ratios, but which also monitors ignition pressures and temperatures. Several prototypes have been built. To test the product, they have decided to test the prototypes at room temperature only for 1000 hours. If you were the test engineer, what would you do to improve this test? … & why?
A control chart is about to be set up at a European facility. They are considering a control chart with limits either at ±2.5 sigma from the center line or ±3 sigma from the center line.
Summarize the advantages/disadvantages of using either of these control chart limitations:
Believe it or not, a company is going about to design a better, and more long- lasting weathervane. A prototype is shown below. Attach a DFMEA for this design to your solution sheet. In your DFMEA, include separate columns for prevention and detection DFMEA(s). You do not need to complete the recommended actions columns.
Develop a p-diagram for the weathervane described in problem 4. In particular, list:
at least one signal factor, M.
set of control factors
noise factors
response Y ( desired and undesired output)
Show how your DFMEA in problem 6 can be linked up with your…