Operations Management Final Exam Questions 2015

by | Nov 30, 2023 | questions

4.

For
each of the accompanying control charts, analyze the data using both median
and up/down run tests with z = ± 1.96 limits.

a.

Are nonrandom variations present?
Assume the center line is the long-term median.

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

Test

Conclusion

Median

Up/Down


b.

Are nonrandom variations present?
Assume the center line is the long-term median.

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

Test

Conclusion

Median

Up/Down


5.

A
company has just negotiated a contract to produce a part for another firm. In
the process of manufacturing the part, the inside diameter of successive
parts becomes smaller and smaller as the cutting tool wears. However, the
specs are so wide relative to machine capabilities that it is possible to set
the diameter initially at a large value and let the process run for a while
before replacing the cutting tool.

The
inside diameter decreases at an average rate of .001 cm per part, and the
process has a standard deviation of .05 cm. The variability is approximately
normal. Assuming a three-sigma buffer at each end, how frequently must the
tool be replaced if the process specs are 3 cm and 3.5 cm. Use (Number of
shafts) n = 1.

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

Determine how many pieces can be
produced before the LCL just crosses the lower tolerance of 3 cm. (Do not round your intermediate calculations.)

After pieces
the cutting tool should be replaced.

6.

A
production process consists of a three-step operation. The scrap rate is 10
percent for the first step and 6 percent for the other two steps.

a.

If
the desired daily output is 450 units, how many units must be started to
allow for loss due to scrap? (Do not round
intermediate calculations. Round up your final answer to the next whole
number.)

Number of units

b.

If
the scrap rate for each step could be cut in half at every operation, how
many units would this save in terms of the scrap allowance? (Do not round intermediate calculations. Round up your
final answer to the next whole number.)

Number of units

c.

If
the scrap represents a cost of $10 per unit, how much is it costing the
company per day for the original scrap rate (i.e. the Part a scrap rate)? (Round your answer to the nearest whole number. Omit the
“$” sign in your response.)

Cost

$

12.

Use
the assignment method to obtain a plan that will minimize the processing
costs in the following table under these conditions:

WORKER

A

B

C

D

E

1

14

18

20

17

18

2

14

15

19

16

17

Job

3

12

16

15

14

17

4

11

13

14

12

14

5

10

16

15

14

13


a.

The combination 2-D is
undesirable.

The sequence is

.

b.

The combinations 1-A and 2-D are
undesirable.

The sequence is

.

The
following table shows orders to be processed at a machine shop as of 8:00
a.m. Monday. The jobs have different operations they must go through.
Processing times are in days. Jobs are listed in order of arrival.

Job

Processing
Time (Days)

Due
Date
(Days)

Remaining
Number
of Operations

A

8

20

2

B

10

18

4

C

5

25

5

D

11

17

3

E

9

35

4


a.

Determine the processing sequence
at the first work center using each of these rules: (1) First come, first
served, (2) Slack per operation.

Sequence for First
come, first served

Sequence for Slack per
operation


b.

Compute the effectiveness of each
rule using each of these measures: (1) average completion time, (2) average
number of jobs at the work center. (Round your
answers to 2 decimal places.)

First
Come, First Served

Slack
per Operation

Average completion
time

Average number of jobs


14.

The
times required to complete each of eight jobs in a two-machine flow shop are
shown in the table that follows. Each job must follow the same sequence,
beginning with machine A and moving to machine B.

TIME (hours)

Job

Machine
A

Machine
B

a

16

5

b

3

13

c

9

6

d

8

7

e

2

14

f

12

4

g

18

14

h

20

11


a.

Determine a sequence that will
minimize makespan time.

The sequence is

.

b.

Find machine B’s idle time.

Idle time

hrs

c.

For
the sequence determined in part a, how much would machine B’s idle
time be reduced by splitting the last two jobs in half?

16.

For each of the following network
diagrams, determine both the critical path and the expected project duration.
The numbers on the arrows represent expected activity times.

a.

Activity-on-arrow diagram

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

The critical path is

.

The expected project
duration is .


b.

Activity-on-node diagram

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

The critical path is

.

The expected project
duration is .


c.

Activity-on-arrow diagram

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

The critical path is

.

The expected project
duration is .


17.

For each of the problems listed,
determine the following quantities for each activity: the earliest start
time, latest start time, earliest finish time, latest finish time, and slack
time. List the critical activities, and determine the expected duration of
the project.

a.

Activity-on-arrow diagram

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

Summary:

Activity

ES

EF

LF

LS

Slack

1–2

2–4

4–7

7–10

10–12

2–5

5–8

8–10

1–3

3–6

6–9

9–11

11–12


b.

Activity-on-node diagram

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

Summary:

Activity

ES

EF

LF

LS

Slack

1

2

3

4

5

6

7

8

9


c.

Activity

Immediate
Predecessor

Estimated
Time (days)

A

—

15

B

A

12

C

B

6

D

B

5

E

C

3

F

—

8

G

F

8

H

F

9

I

G

7

J

H

14

K

J

6

End

D,
E, I, K


Summary:

Activity

ES

EF

LF

LS

Slack

A

B

C

E

D

F

G

I

H

J

K


18.

Reconsider the network diagram.
Suppose that after 12 weeks, activities 1-2, 1-3, and 2-4 have been finished;
activity 2-5 is 75 percent finished; and activity 3-6 is half finished. How
many weeks after the original start time should the project be finished?

Operations Management Final Exam Questions 2015.jpg” alt=”Picture”>

Project can be
completed in a total of weeks.

ScholarMatic: Explanation & Answer

Your ready answer from a verified tutor is just a click away for as little as $14.99


  

Click Order Now to get 100% Original Answer Customized to your instructions!

HOME TO CERTIFIED WRITERS

Why Place An Order With Us?

  • Certified Editors
  • 24/7 Customer Support
  • Profesional Research
  • Easy to Use System Interface
  • Student Friendly Pricing

Have a similar question?

PLAGIRAISM FREE PAPERS

All papers we provide are well-researched, properly formatted and cited.

TOP QUALITY

All papers we provide are well-researched, properly formatted and cited.

HIGHLY SECURED

All papers we provide are well-researched, properly formatted and cited.

ScholarMatic: Get Started

Assignment Writing Service

Feel safe and secure when placing an order on our portal!
Fruitful cooperation begins with solid guarantees, and we are professional enough to promise perfect results. Let’s get it started!