Assume
you have bought an old, semi-furnished house and need to renovate it before
moving in. Generally, renovation work can be of different categories, such as
furniture, electrical equipment, plumbing, landscaping (garden), and painting.
You will have to engage an external agency to get a portion of this work
completed. However, before you start the whole renovation effort, you need to
decide on two aspects: the amount of time required for the whole project and
the cost to complete the renovation.
Determine
the need to develop the WBS before defining the activities in every instance.
In the given scenario, think of the different types of dependencies within the
project. In your opinion, how do the activity dependencies impact the project
duration? Explain why control accounts are identified in the WBS.
Determine
whether a WBS is necessary for every project irrespective of its scope. Do you
think a WBS is needed for a project where the scope is only to renovate the
living room, which includes furniture and painting as major deliverables?
References to use
Sanghera, P. (2010) PMP速 in depth: project management
professional study guide for the PMP速 exam.2nd ed.
Boston: Course Technology/Cengage Learning. pp. 79-135
Plus minimum of 2 other relevant references.
Time required is 3rd May 2013 by 6am (BST)