Show transcribed image text Develop the activity sequence model and determine the normal time for the following work activity: A worker walks 5 steps, picks up a small part from the floor, returns to his original position, and places the part on his worktable. Referring to Table 14.6, the indexed activity sequence model for this work activity would be the following:
Develop the activity sequence model and determine the normal time for the following work activity: A worker walks 5 steps, picks up a small part from the floor, returns to his original position, and places the part on his worktable. Referring to Table 14.6, the indexed activity sequence model for this work activity would be the following:





