FINAL EXAM

Question 1

In a PERT network, the earliest (activity) start time is
the:

Question options:

earliest time that an activity can be finished without
delaying the entire project.

latest time that an activity can be started without delaying
the entire project.

earliest time that an activity can start without violation
of precedence requirements.

latest time that an activity can be finished without
delaying the entire project.

none of the above.

Question 2

Slack time in a network is the:

Question options:

amount of time that you would expect it would take to
complete the activity.

shortest amount of time that could be required to complete
the activity.

amount of time that an activity would take assuming very
unfavorable conditions.

amount of time that an activity can be delayed without
delaying the entire project.

difference between the expected completion time of the
project using pessimistic times and the expected completion time of the project
using optimistic times.

Question 3

Given the following small project, the critical path is
__________ days.

Question options:

none of the above

16

20

10

14

Subsection

Question 4

A finite population model differs from an infinite
population model because there is a random relationship between the length of
the queue and the arrival rate.

Question options:

True

False

Question 5

In a single-channel, single-phase system, reducing the
service time only reduces the total amount of time spent in the system, not the
time spent in the queue.

Question options:

True

False

Question 6

Assume that we are using a waiting line model to analyze the
number of service technicians required to maintain machines in a factory. Our
goal should be to:

Question options:

maximize productivity of the technicians.

minimize the downtime for individual machines.

minimize the percent of idle time of the technicians.

minimize the total cost (cost of maintenance plus cost of
downtime).

minimize the number of machines needing repair.

Question 7

A certain firm has four different operations that must be
assigned to four locations. The profit (in thousands of dollars) associated
with each operation at each location is presented below. The firm’s vice
president would like to assign the various operations so that the total profit
is maximized. Find the appropriate assignments.

Using the data in the table, what is the optimal location
for Operation X?

Question options:

2

4

1

3

Question 8

Given the table below, the final table for an assignment
problem, who should be assigned to Job 2?

Question options:

Either worker A or worker C

Worker C

Worker D

Neither worker A nor worker C

Worker A

Question 9

Consider the following linear programming problem:

Maximize 4X + 10Y

Subject to:

3X +
4Y ? 480

4X +
2Y ? 360

all
variables ? 0

The feasible corner points are (48,84), (0,120), (0,0),
(90,0). What is the maximum possible value for the objective function?

Question options:

None of the above

1,032

1,600

360

1,200

Question 10

The shortest-route technique might be logically used for:

Question options:

finding the most scenic route to allow travel to several
places during a trip on spring break.

none of the above.

connecting all the points of a network together while
minimizing the distance between them.

finding the shortest travel distance between two points.

finding the longest time to travel between two points.

Question 11

A certain firm has four different operations that must be
assigned to four locations. The profit (in thousands of dollars) associated
with each operation at each location is presented below. The firm’s vice
president would like to assign the various operations so that the total profit
is maximized. Find the appropriate assignments.

Using the data in the table, what is the optimal location
for Operation Z?

Question options:

4

2

1

3

Question 12

When using a general LP model for transportation problems,
if there are 4 sources and 3 destinations, which of the following statements is
true?

Question options:

There are typically 12 decision variables and 3 constraints.

There are typically 12 decision variables and 7 constraints.

There are typically 7 decision variables and 7 constraints.

There are typically 12 decision variables and 12
constraints.

There are typically 4 decision variables and 3 constraints.

Question 13

Consider the following linear programming problem.

Maximize 5X1 +
3X2

Subject to:

X1 + X2 ? 20

X1 ? 5

X2 ? 10

X1,
X2 ? 0

Using Excel QM, what
are the optimal values of X1 and X2 respectively?

Question options:

0; 20

10; 5

5; 10

20; 0

Question 14

To guarantee that cans of soup are properly filled, some
cans are sampled and the amounts measured. The overall average for the samples
is 12 ounces. Each sample contains 10 cans. The average range is 0.4 ounces.

Using the data in the table above, what is the lower control
chart limit for the sample averages?

Question options:

12.308

12.1232

11.8768

13.2

None of the above

Question 15

A company must assign mechanics to each of four jobs.

The time involved varies according to individual abilities.
The table shows how many minutes it takes each mechanic to perform each job. If
the optimal assignments are made, how many total minutes would be required for
completing the jobs?

Question options:

0

4

None of the above

17

16

Question 16

Practically speaking, multiple optimal solutions __________.

Question options:

are infeasible

provide management with greater flexibility in selecting and
using resources

are unbalanced

are degenerate

are unbounded

Question 17

Which of the following is not a property of linear programs?

Question options:

Objective function and constraints are linear

At least two separate feasible regions

Alternative courses of action

One objective function

One or more constraints

Question 18

Variations that need not occur in production processes are
referred to as __________.

Question options:

assignable variations

none of the above

control variations

process variations

natural variations

Question 19

The maximal-flow technique finds the maximum flow of any
quantity or substance through a network.

Question options:

True

False

Question 20

Transportation models can be used for which of the following
decisions?

Question options:

Production mix

Media selection

Portfolio selection

Employee shift scheduling

Facility location

Question 21

When receiving a shipment from a supplier, inspection must
be done to check the fraction of defective products. This is best monitored by
which of the following control charts?

Question options:

p-chart

None of the above

R-chart

c-chart

x-bar chart

Question 22

According to the table below, there are five activities in a
PERT project.

Using the data in the table, if the normal distribution were
used to find the probability of finishing this project in 24 weeks or fewer,
what mean and variance respectively would be used?

Question options:

20; 4.222

30; 4.222

30; 5.222

22.667; 1.111

20; 5.222

Question 23

The wait time for a single-channel system is more than twice
that for a two-channel system using two servers working at the same rate as the
single server.

Question options:

True

False

Question 24

Customers enter the waiting line to pay for food as they
leave a cafeteria on a first-come, first-served basis. The arrival rate follows
a Poisson distribution, while service times follow an exponential distribution.
If the average number of arrivals is four per minute and the average service
rate of a single server is seven per minute, what proportion of the time is the
server busy?

Question options:

0.33

0.25

0.43

0.57

0.75

Question 25

The average range of a process for packaging cereal is 1.1
ounces. Assume the sample size is 10.

Using the data in the table above, what is the lower control
chart limit for the sample ranges?

Question options:

1.777

None of the above

0.245

0.223

1.955

Question 26

A certain firm has four different operations that must be
assigned to four locations. The profit (in thousands of dollars) associated with
each operation at each location is presented below. The firm’s vice president
would like to assign the various operations so that the total profit is
maximized. Find the appropriate assignments.

Using the data in the table, what is the optimal location
for Operation Y?

Question options:

3

2

1

4

Question 27

An airline company tracks the number of lost bags that occur
each day. This is best monitored by which of the following control charts?

Question options:

x-bar chart

c-chart

None of the above

R-chart

p-chart

Question 28

A hospital ward with only 30 beds could be modeled using a
finite population model.

Question options:

True

False

Question 29

To guarantee that cans of soup are properly filled, some
cans are sampled and the amounts measured. The overall average for the samples
is 12 ounces. Each sample contains 10 cans. The average range is 0.4 ounces.

Using the data in the table above, what is the upper control
chart limit for the sample averages?

Question options:

13.2

12.308

11.8768

12.1232

None of the above

Question 30

The points on the network are referred to as nodes.

Question options:

True

False

Question 31

Lines connecting nodes on a network are called links.

Question options:

True

False

Question 32

According to the table below, there are five activities in a
PERT project.

Using the data in the table, what is the variance of the
critical path?

Question options:

0

1.222

1.111

4.222

5.222

Question 33

Which of the following questions can be answered by PERT?

Question options:

What are the noncritical activities?

When will the entire project be completed?

What is the probability that the project will be completed
by a specific date?

All of the above

What are the critical activities?

Question 34

A transportation problem:

Question options:

may give an initial feasible solution rather than the
optimal solution.

requires the same assumptions that are required for linear
programming problems.

is a special case of the linear programming problem.

can be solved by linear programming, but is solved more
efficiently by a special-purpose algorithm.

All of the above are correct.

Question 35

Bank Boston has a branch at Bryant College. The branch is
busiest at the beginning of the college year when freshmen and transfer
students open accounts. This year, freshmen arrived at the office at a rate of
40 per day (assume 8-hour days). On average, it takes the Bank Boston staff
person about ten minutes to process each account application. The bank is
considering having one or two tellers. Each teller is paid $12 per hour and the
cost of waiting in line is assumed to be $8 per hour.

What is the total daily service cost for the two-teller
model?

Question options:

$48

$192

$96

$144

Question 36

A suburban specialty restaurant has developed a single
drive-thru window. Customers order, pay, and pick up their food at the same
window. Arrivals follow a Poisson distribution while service times follow an exponential
distribution. If the average number of arrivals is 6 per hour and the service
rate is 2 every 15 minutes, what is the average number of customers waiting in
line behind the person being served?

Question options:

None of the above

0.75

0.50

3.00

2.25

Question 37

Which of the following is not a popular definition of
quality?

Question options:

Quality is the degree to which a product conforms to design
or specification.

Quality is the totality of features and characteristics of a
product or service that bears on its ability to satisfy stated or implied
needs.

Quality is fitness for use.

Quality is defined as a competitively priced product that
surpasses customer needs.

Even though quality cannot be defined, you know what it is.

Question 38

The following table represents a project with known activity
times. All times are in weeks.

Using the data in the table, what is the minimum possible
time (in weeks) required for completing the project?

Question options:

25

14

None of the above

10

8

Question 39

The c-chart is useful when we:

Question options:

find the number of defective items in a production lot.

take a number of measurements and compute the ranges.

find the fraction of the production lot defective.

None of the above is correct.

take a number of measurements and compute the average.

Question 40

In PERT, we assume that:

Question options:

the total cost of a project is independent of the time to
complete the project.

all activities are carried out by staff from our own
organization.

the total time to complete all activities on the critical
path is described by a normal distribution.

the times to complete individual activities are known with
certainty.

none of the above.

Question 41

A suburban specialty restaurant has developed a single
drive-thru window. Customers order, pay, and pick up their food at the same
window. Arrivals follow a Poisson distribution while service times follow an
exponential distribution. If the average number of arrivals is 6 per hour and
the service rate is 2 every 15 minutes, what proportion of the time is the
server busy?

Question options:

2.25

0.25

0.75

0.50

3.00

Question 42

The R-chart is useful when we:

Question options:

find the number of defective items in a production lot.

find the fraction of the production lot defective.

take a number of measurements and compute the ranges.

None of the above is correct.

take a number of measurements and compute the average.

Question 43

The following table represents a project with four
activities. All times are in weeks.

Using the data in the table, what is the minimal expected
completion tiime (in weeks) for the project?

Question options:

18

None of the above

11

19

37

Question 44

Bank Boston has a branch at Bryant College. The branch is
busiest at the beginning of the college year when freshmen and transfer
students open accounts. This year, freshmen arrived at the office at a rate of
40 per day (assume 8-hour days). On average, it takes the Bank Boston staff
person about ten minutes to process each account application. The bank is
considering having one or two tellers. Each teller is paid $12 per hour and the
cost of waiting in line is assumed to be $8 per hour.

What is the proportion of time that the staffers are busy?

Question options:

.333

.725

.833

.667

Question 45

Which of the following distributions is most often used to
estimate the arrival pattern?

Question options:

Beta

Normal

Negative exponential

Erlang

Poisson

Question 46

What type of problems use LP to decide how much of each
product to make, given a series of resource restrictions?

Question options:

Resource restriction

Product restriction

Resource allocation

Resource mix

Product mix

Question 47

Consider the following linear programming problem:

Maximize 12X + 10Y

Subject to:

4X +
3Y ? 480

2X +
3Y ? 360

all
variables ? 0

The maximum possible value for the objective function is
__________.

Question options:

1,520

360

1,560

none of the above

480

Question 48

Bank Boston has a branch at Bryant College. The branch is
busiest at the beginning of the college year when freshmen and transfer
students open accounts. This year, freshmen arrived at the office at a rate of
40 per day (assume 8-hour days). On average, it takes the Bank Boston staff
person about ten minutes to process each account application. The bank is
considering having one or two tellers. Each teller is paid $12 per hour and the
cost of waiting in line is assumed to be $8 per hour.

What is the total daily waiting cost for the two-teller
model?

Question options:

$133.32

$4.17

$11.20

$266.56

Question 49

The critical path of a network is:

Question options:

the path with zero slack.

none of the above.

the path with the largest variance.

the path with the least variance.

the path with the most activities.

Question 50

Consider the following linear programming model:

Minimize 2X1 + 3X2

Subject to:

X1 +
2X2 ? 1

X2 ?
1

X1 ?
0, X2 ? 0

This problem violates which of the following assumptions?

Question options:

Additivity

Proportionality

Linearity

Divisibility

Non-negativity

ScholarMatic: Explanation & Answer

Your ready answer from a verified tutor is just a click away for as little as $14.99


  

Click Order Now to get 100% Original Answer Customized to your instructions!

HOME TO CERTIFIED WRITERS

Why Place An Order With Us?

  • Certified Editors
  • 24/7 Customer Support
  • Profesional Research
  • Easy to Use System Interface
  • Student Friendly Pricing

Have a similar question?

PLAGIRAISM FREE PAPERS

All papers we provide are well-researched, properly formatted and cited.

TOP QUALITY

All papers we provide are well-researched, properly formatted and cited.

HIGHLY SECURED

All papers we provide are well-researched, properly formatted and cited.

ScholarMatic: Get Started

Assignment Writing Service

Feel safe and secure when placing an order on our portal!
Fruitful cooperation begins with solid guarantees, and we are professional enough to promise perfect results. Let’s get it started!