1.To separate the semi-variable costs into their fixed andvariable components, one can use which of the followingmethods?
a)labor variance method
b)material variance method
c)relevant range of activity method
d)high-low point method
2.A budget prepared using several differing levels of activity isa:
a)fixed budget
b)flexible budget
c)manufacturing cost budget
d)budget performance report
3.Direct factory labor is usually considered to be a___________cost.
a)variable
b)fixed
c)semi-variable
d)mixed
4.The cost of utilities consumed in the factory is a good exampleof a_______cost.
a)variable
b)fixed
c)semi-varible
d)standard
5.The salary of the factory supervisor is a good example of a__________cost.
a)variable
b)fixed
c)semi-variable
d)standard
6.As the level of activity increases, the fixed cost per unit ofactivity:
a)increases
b)decreases
c)does not change
d)may increase or decrease
7.As the level of activity increases, the variable cost per unit ofactivity:
a)increases
b)decreases
c)does not change
d)may increase or decrease
8.As the level of activity increases, the total variable costs forthe period:
a)increase
b)decrease
c)do not change
d)may increase or decrease
9.As the level of activity increases, the total fixed costs for theperiod:
a)increases
b)decrease
c)may increase or decrease
d)do not change
10.Costs that reflect what costs should be for the units of productmanufactured during the period under normal efficient operatingconditions are known as ___________costs.
a)variable
b)fixed
c)standard
d)semi-variable
11.In a factory, the fixed costs per unit are $45 when 400 unitsare produced. If 450 units are produced, the fixed costs per unitwould be:
a)$45
b)$40
c)$10
d)$50.63
12.In a factory,the total variable costs are $600 if 500 units areproduced. If 400 units are produced, the total variable costs wouldbe:
a)$480
b)$600
c)$120
d)$333
13.The standard quantity of materials for a product was 40 poundsper unit at the standard price of $2.00 per pound.The actual priceper pound of materials was $1.50, and the actual quantity used was44 pounds.An analysis would indicate a:
a)$20.00 favorable price variance
b)$22.00 favorable price variance
c)$6.00 unfavorable quantity variance
d)$18.00 favorable price variance
14.The labor standard for a product was five hours at a wage rateof $8 per hour.The firm produced 900 units of the item.Labor Coststotaled $35,250 and 4,700 hours of labor were used.An analysis oflabor costs would indicate:
a)a $750 favorable labor rate variance
b)a $1,600 unfavorable labor time variance
c)both the labor rate variance and the labor time variance listedabove
d)a $1,600 favorable labor rate variance
15.The quantity variance for an item is the difference between itsactual quantity and its standard quantity multiplied be the:
a)standard cost of the item
b)actual cost of the item
c)price variance
d)budgeted amount for the item
16.An unfavorable price variance for materials means that:
a)the actual cost of the materials was more than the budgetedamount
b)more materials were used in production than anticipated
c)more labor hours were required to work with the materials thanexpected
d)the actual cost of the materials was more than the standardcost
17.The materials price variance for an item is the differencebetween its actual price and its standard cost:
a)multiplied by the actual quantity used
b)multiplied by the standard quantity allowed
c)multiplied by the difference between the actual quantity and thestandard quantity
d)divided by the actual quantity
18.The flexible budget usually shows:
a)only fixed costs
b)only variable costs
c)fixed and variable costs together
d)fixed and variable costs separately
Use the following information to answer questions 19 and 20.
The standard costs for a unit of product are shown below.
Materials 2 pounds at $1.00 perpound $2.00
Labor 1 hour at $10.00 perhour 10.00
Overhead 60% of directlabor 6.00
During June, Job N-5 for 100 units was completed. The actual costsof the job are shown below.
Materials 300 pounds at $1.45 perpound $435
Labor 200 hours at $9.50 perhour 1,900
OverheadApplied 60% of directlabor 1,140
19.Which of the following represents the material pricevariance?
a)$325 unfavorable
b)$235 unfavorable
c)$100 unfavorable
d)$135 unfavorable
20.Which of the following represents the material quantityvariance?
a)$325 unfavorable
b)$235 unfavorable
c)$100 unfavorable
d)$135
ScholarMatic | 24/7 Homework Help
ScholarMatic Will Help You Write Your Essays and Term Papers
Answered » You can buy a ready-made answer or pick a professional tutor to order an original one.
To separate the semi-variable costs into their fixed and variable components
HOME TO CERTIFIED WRITERS

Why Place An Order With Us?
- Certified Editors
- 24/7 Customer Support
- Profesional Research
- Easy to Use System Interface
- Student Friendly Pricing
Have a similar question?
ScholarMatic: Get Started
Assignment Writing Service
Feel safe and secure when placing an order on our portal!
Fruitful cooperation begins with solid guarantees, and we are professional enough to promise perfect results. Let’s get it started!